Faber STGL36SSV Stilo Glass

User Manual - Page 13

For STGL36SSV.

PDF File Manual, 116 pages, Download pdf file

Loading ...
Loading ...
Loading ...
13
1. Place a bracket
D
on the wall as shown about 1/8" from the
ceiling or upper limit, aligning the center (notch) with the
vertical reference line
X
and mark the wall at the centers of the
holes in the bracket.
2. Place the second bracket
D
on the wall as shown, below the
rst bracket, at the height of the upper chimney section
C
supplied and aligning the center (notch) with the vertical line.
3. Mark the wall at the centers of the holes in the bracket and mark
the point 1 and 2 for the Hood Body installation as shown(12
5/8" from the horizontal line and 4 9/16" from the vertical line).
4. Drill ø 5/16" holes at all the center points marked (point
1,2,3,4,5,6) as shown.
3
C
D
Loading ...
Loading ...
Loading ...