Howard McCray SF75-FF Howard-McCray 78.00'' 75.0 cu. ft. Top Mounted 3 Section Solid Door Reach-In Freezer

Service manual - Page 4

For SF75-FF.

PDF File Manual, 24 pages, Read Online | Download pdf file

SF75-FF photo
Loading ...
Loading ...
Loading ...
Howard-McCray A Division of HMC Enterprises, LLC.
831 East Cayuga Street • Philadelphia, PA 19124 USA • (215) 464-6800 • (800) 344-8222
Fax (215) 969-4890 • E-Mail: [email protected] 101018
2
The following instructions are for the benefit of the new owner and the installing contractor.
They should be studied carefully before attempting to install or operate the cabinet.
This manual is the property of the owner and should remain in the owner’s possession.
Engineering Specifications SR Models
Model No.
Cabinet
Dimensions
D x H* x L
Compressor
HP
Electrical Voltage
Max. Amps
Power Cord
Plug (NEMA)
SR22 35 x 83 x 26 1/2 1/4 115/60Hz/1PH 6.8 5-15P
SR48 35 x 83 x 52 1/4 1/3 115/60Hz/1PH 9.6 5-15P
SR75 35 x 83 x 78 1/2 115/60Hz/1PH 12.1 5-20P
Engineering Specifications SF Models
Model No.
Cabinet
Dimensions
D x H* x L
Compressor
HP
Electrical Voltage
Max. Amps
Power Cord
Plug (NEMA)
SF22 35 x 83 x 26 1/2 1/2 115/60Hz/1PH 9.5 5-15P
SF48 35 x 83 x 52 1/4 3/4 115/60Hz/1PH 7.9 5-20P
SF75 35 x 83 x 78 1 115/208-
230/60Hz/1PH
8.6 N/A
* - Includes 5" Casters
These cabinets are designed to operate in an air conditioned location ONLY.
Temperature not to exceed 75
o
F and a relative humidity not to exceed 55%.
Receiving and Inspection Procedure
1) The cabinet has been carefully operation
tested and inspected before crating and has
been determined to be in good operating
condition before leaving the factory.
2) Upon arrival of the cabinet, the crate should be
inspected thoroughly for any damage that may
have occurred in transit. In the event that any
damage is discovered, it should be noted on the
delivery ticket or Bill of Lading and signed to that
effect. An immediate claim should then be filed
against the carrier giving them the description
and amount of damage.
3) After the crate has been removed, the cabinet
should be examined carefully for any damage. If
there is any concealed damage, the carrier
should be notified immediately. Make a request in
writing with the carrier for an inspection within 15
days, and retain all packaging. The carrier will
supply the inspection report and the required
claim forms.
4) Our Company can assume no responsibility for
filing freight claims as the cabinet was in good
condition on a clear Bill of Lading, F.O.B.
Philadelphia. However, the factory will assist, if
required.
5) Shortages - Check your shipment for any
possible shortages of material. If one exists and
is found to be responsibility of Howard-McCray,
notify the factory. Howard-McCray will
acknowledge shortages within ten days from
receipt of acknowledgement. If a shortage exists
and it involves the carrier, notify the carrier
immediately and request an inspection.
Loading ...
Loading ...
Loading ...