Loading ...
Loading ...
Loading ...
22 HCD710A, HMD710A
Fig. 23
2 1. Install rear shuttle insulation (Fig. 23.1) and slide
main housing (Fig. 23.2) onto auger.
22. Secure with three screws.
1
2
Fig. 24
23. Install shuttle switch.
§ Align holes with pins (Fig. 24.1) and depress switch
button (Fig. 24.2) to clear shuttle tab.
Fig. 25
24. Install shuttle drain tube and front feed water tube
(Fig.25).
Note: Ensure water feed tube is inserted 5/8".
Loading ...
Loading ...
Loading ...