Loading ...
Loading ...
Loading ...
6
bromic.com/heating-au
HEATING INSTALLATION INSTRUCTIONS
Heaters must be installed according to the
minimum installation clearances shown in these
diagrams
CEILING & WALL MOUNTING
Heaters must be away from the fourth wall.
This heater MUST be permanently installed by
an authorised/licenced person. Do not perform
maintenance, or carry out installation or assembly
procedure while electrical power is switched on. Wait
2 hours after switching off the heater before handling.
!
!
Ensure that the heating unit is not directly
exposed to rain or water contact. For longest
product life and to maintain product appearance,
mount heater under cover and protect from rain
and weather.
WARNING - Outdoor InstallationWARNING - Outdoor Installation
2400
1800 150165
WALL MOUNTING
CEILING
FLOOR
250 (2300w Model)
450 (3400w Model)
2400 215
2615
CEILING MOUNTING
(FACE DOWN)
CEILING
FLOOR
300
2400 215
2615
CEILING MOUNTING
CEILING
FLOOR
300
2400 245
2645
CEILING MOUNTING
(ANGLED)
CEILING
FLOOR
! WARNING
MINIMUM DISTANCE BETWEEN
HEATERS MEASURED FROM EDGE OF
HEATER MUST BE AT LEAST 500mm
The stated clearance to combustible
materials represents surface
temperature of 65°C above room
temperature. Building material with a
low heat tolerance (such as plastic,
vinyl siding, canvas, tri-ply etc.) may
subject to degradation at lower
temperature. It is the installer’s
responsibility to assure that adjacent
materials are protected.
Loading ...
Loading ...
Loading ...