33
11. Maintenance
Notes:
All repairs and service on the Switch Module, STS Module, Power Module and Battery Modules must be performed by authorized service personnel only. There
are no user-serviceable parts inside the UPS Modules.
When exchanging or removing modules, remove modules, where possible, from the top of the frame enclosure to the bottom to prevent the frame from tipping
(the UPS system has a high center of gravity).
Power Modules may be hot-swapped without switching to bypass. It is recommended, when possible, to always switch to bypass as a best practice.
WARNING
Ensure all Power Modules contain identical firmware versions prior to installation.
11.1 Power Module Replacement
1. Confirm the UPS system is in normal operation and the bypass feature is enabled.
2. Via the Home screen, enter Menu – Control – Transfer to Bypass ‘YES’ (see also Sections 8.2: Transfer to Bypass via Control Panel and
9.3.4: Control Screen). The UPS system will transfer to bypass; confirm the bypass path is shown on the Control Panel and the bypass LED
is illuminated.
3. Place the ready switch on the front panel of the Power Module to the unlocked position by rotating the knob counterclockwise.
4. The Power Module FAULT LED (RED) will be lit to indicate the Power Module output is off and disconnected from UPS.
5. Wait 5 minutes after unlocking the Power Module to service.
6. Remove the four screws from the fixing bracket.
7. Fully remove the Power Module from the frame.
Note: The Power Module is heavy; two people should remove it.
8. Confirm the replacement Power Module DIP switches are set correctly (see Section 7.2.1: Installing a Power Module) and the ready switch
is in the unlocked position.
9. Slide the Power Module into the frame and tighten the four screws into the fixing brackets on either side.
10. Place the ready switch into the locked position.
11. Via the Home screen, enter Menu – Control – System On ‘YES’. The UPS system is now in normal operation.
Note: If installing more than one Power Module, follow steps 1-10 per module. Once all are installed, complete step 11. Leave 10 seconds between each
separate Power Module installation; do not install them concurrently.
11.2 Battery Module Replacement
1. See Sections 7.2.3 Installing a Battery Module and 7.2.4: Removing a Battery Module for instruction on battery module replacement.
Note: Please contact your local supplier or go to tripplite.com/support/technical-support-request for further details.
11.3 Installing/Replacing the Air Filters
The SmartOnline SVX-Series is supplied as standard with two air filters for all frame options.
To install the filters for SVX-Series:
1. Open the front door of the frame.
2. Inserting the lower pair of filters first; slide into place using the side rails to guide the filter downwards.
3. Guide the upper pair of filters into place and slide beneath the bracket behind the front panel.
4. The upper filter bases rest on the lower filter top as shown.
5. The second filter from the top rests on top of the second filter from the bottom.
5.
4.
3.
2.
1.
Loading ...
Loading ...
Loading ...