Loading ...
Loading ...
Loading ...
6
Installation of the Guardrail (optional)
1. Place the guardrail on top of the kegerator and line up the feet with the holes on top of the
cabinet
2. Using the screws provided, secure each foot to the cabinet
Installation of the Casters (optional)
1. Remove everything from the cabinet and lay the unit on a clean, dry, and padded surface.
2. Remove the four feet at the bottom of the unit as shown, install caster into the holes and tighten
with a Phillips screwdriver.
3. The two casters equipped with locks should be installed on the front of the unit.
4. Once all four casters are attached, return the kegerator to an upright position.
5. Allow the unit to sit for 8-10 hours before plugging in to allow the refrigerant to settle.
Installation of Tap Cooled System
Your kegerator is equipped with a tap cooled system, which can keep the liquid in a singe or double
tap cool. NOTE: The tap cooling tube will not work for a triple tap system.
To install:
1. Remove the plug on the top of your kegerator.
2. Push the black tap cooling tube up through the top hole.
3. Install your tapping tower over the tube.
Shelves
Your unit comes with two adjustable shelves, which can also be removed should you decide not to
use them.
Interior Strap
Use the strap located inside the unit to secure the CO
2
tank in place.
NOTE: Instructions for your tapping equipment (if included) are packaged inside the tap kit. These
can be downloaded from the product page listing on our website at
www.summitappliance.com.
Loading ...
Loading ...
Loading ...