Loading ...
Loading ...
Loading ...
7.76"
7. 76 "
Step 6:
As per the screw positions on the
upper support frame, drill 4 holes
(about Φ0.31"), then fill the
expanding rubber into the holes.
Aiming the holes on the ceiling, fix
the ceiling cover with the expanding
screws tightly and make sure it is firm.
Step 5:
Put the inner duct cover and outer
duct cover on the blower box.
The pull out the exhaust pipe to
the level of the inner duct cover.
Expansion hanger
Step 3
Match the 8pcs expansion hanger
with the hoods assembly.
16pcs screws
16pcs nuts
Step 4:
Use 16pcs M4 screws to fix the
hangers.
Step 7:
Install expansion strip with the ceiling
cover (Upper one).
Loading ...
Loading ...
Loading ...