Home
Bookmarks
Home
Nor-Lake
Nor-Lake KLB8488-C User Manual
Nor-Lake KLB8488-C Walk-In Cooler & Top Mounted Compressor
Owner s manual
For KLB8488-C.
PDF File Manual
,
104 pages
,
Read Online
|
Download pdf file
Introduction
PRODUCT SAFETY POLICY
TOOLS REQUIRED FOR UNCRATING AND INSTALLATION OF YOUR RSG WALK-IN
UNPACKING / INSPECTION
Standard Walk-in panels Refrigeration System with Control Panel
FOAM PANEL STORAGE
CONSTRUCTION DIAGRAM
SECTION LATCHES
TO OPERATE LATCHES
SITE SELECTION, BASE PREPARATION AND LEVELING THE FLOOR WALK-IN COOLER OR FREEZER WITH A FLOOR
FLOOR INSTALLATION (Shim Leveling Method)
DO NOT LOCK!
SITE SELECTION, BASE PREPARATION
Figure 1
ALTERNATE SHIMMING METHOD FOR 1’’ VINYL SCREED
SITE SELECTION, BASE PREPARATION
Figure 1
SEALER GUIDE INSTALLATION
FOAMED SEALER (Screed) INSTALLATION
Figure 5
WALK-IN INSTALLATION
WALL AND CEILING PANEL CONSTRUCTION
DO NOT SHORT-CUT! TAKE ENOUGH TIME TO PROPERLY ALIGN ALL SECTIONS.
PANEL INSTALLATION ORDER
DOOR/DOOR SECTION
SLAM BRACES
EXTERIOR RAMP INSTALLATION INSTRUCTIONS
INTERIOR RAMP INSTALLATION INSTRUCTIONS
Step 2
Step 3
MEMBRANE ROOF INSTALLATION INSTRUCTIONS
Step #1
Step #2
Step #3
Step #4
Electrical Connections
WIRING
It is the electrical contractor's responsibility to provide the necessary wiring, connections, conduit and fittings to complete the hook-up.
POSITIONING THE THERMOMETER SENSING BULB
PRESSURE RELIEF PORT
WALK-IN DOOR WITH NL508 LIGHT SWITCH WIRING DIAGRAM
WALK-IN DOOR WITH NL708 LIGHT SWITCH WIRING DIAGRAM
ADJUSTING DOOR HINGE ON NORLAKE WALK-INS
ADJUSTING DOOR HINGE ON MASTER-BILT WALK-INS
REPLACEMENT OF THE MAGNETIC DOOR GASKET ASSEMBLY
DOOR ASSEMBLY REMOVAL - ALL FOAMED WALK-IN COOLER OR FREEZERS WITH CAM LIFT HINGES
RESETTING SPRING HINGES
DOOR GASKET REPLACEMENT
SWEEP GASKET
OPERATION
ADJUSTING THE SWEEP GASKET
ADJUSTING THE SWEEP GASKET
DOOR CLOSER
ANTI-CONDENSATE DOOR OPENING HEATER
HEATER WIRE REPLACEMENT
STAINLESS STEEL TRIM REMOVAL
INSTALLATION OF THE REPLACEMENT HEATER
STAINLESS STEEL TRIM REPLACEMENT
THRESHOLD REPLACEMENT
ELECTRICAL CONNECTION
PANEL CLEANING AND MAINTENANCE RECOMMENDATIONS
Note: RSG recommends pictures be taken after the installation is complete.
1). Exterior door section (full view)
Contact Technical Department:
Norlake: 800-388-5253
Master-Bilt: 800-684-8988
Construction Diagram
RSG Inspection Label and Panel Specific Part Number
132617 Walk-in Manual-SPANISH.pdf
Introducción
POLÍTICA DE SEGURIDAD DEL PRODUCTO
HERRAMIENTAS NECESARIAS PARA DESEMBALAR E INSTALAR SU CÁMARA FRIGORÍFICA RSG
DESEMBALAJE E INSPECCIÓN
Paneles de cámaras frigoríficas estándar Sistema de refrigeración con panel de control
ALMACENAMIENTO DEL PANEL DE ESPUMA
DIAGRAMA DE MONTAJE
CERROJOS DE SECCIÓN
PARA OPERAR LOS CERROJOS
SELECCIÓN DEL LUGAR, PREPARACIÓN DE LA BASE Y LA NIVELACIÓN DEL PISO CÁMARA FRIGORÍFICA O CÁMARA CONGELADORA CON PISO
INSTALACIÓN DEL PISO (Método de nivelación por calce)
SELECCIÓN DEL LUGAR, PREPARACIÓN DE LA BASE
Figura 1
MÉTODO DE CALCE ALTERNATIVO PARA ENRASE DE VINILO DE 2,5 CM
SELECCIÓN DEL LUGAR, PREPARACIÓN DE LA BASE
Figura 1
INSTALACIÓN DE GUÍA PARA SELLADOR
INSTALACIÓN DEL SELLADOR DE ESPUMA (enrase)
Figura 5
INSTALACIÓN DE LA CÁMARA FRIGORÍFICA
MONTAJE DE LOS PANELES DE PARED Y TECHO
¡NO TOME ATAJOS! TÓMESE EL TIEMPO SUFICIENTE PARA ALINEAR CORRECTAMENTE TODAS LAS SECCIONES.
ORDEN DE INSTALACIÓN DEL PANEL
PUERTA Y SECCIÓN DE LA PUERTA
RIOSTRAS DE SOSTÉN
INSTRUCCIONES DE INSTALACIÓN DE LA RAMPA EXTERIOR
INSTRUCCIONES DE INSTALACIÓN DE LA RAMPA INTERIOR
Paso 2
Paso 3
INSTRUCCIONES DE INSTALACIÓN DE TEJADO DE MEMBRANA
Paso 1
Paso 2
Paso 3
Paso 4
Conexiones eléctricas
CABLEADO
Es responsabilidad del contratista eléctrico proveer el material de cableado necesario, conexiones, conductos y accesorios para realizar el acoplamiento.
UBICACIÓN DEL BULBO SENSOR DEL TERMÓMETRO
PUERTO DE ALIVIO DE PRESIÓN
AJUSTE DE LA BISAGRA DE LA PUERTA EN CÁMARAS FRIGORÍFICAS NORLAKE
AJUSTE DE LA BISAGRA DE LA PUERTA EN CÁMARAS FRIGORÍFICAS MASTER-BILT
REEMPLAZO DEL CONJUNTO DE JUNTAS MAGNÉTICAS DE LA PUERTA
EXTRACCIÓN DEL CONJUNTO DE LA PUERTA: TODAS LAS CÁMARAS FRIGORÍFICAS Y CONGELADORAS CON ESPUMA PLÁSTICA Y BISAGRAS ACCIONADAS POR LEVAS DE ALZAMIENTO
RESTABLECIMIENTO DE LAS BISAGRAS CON RESORTE
REEMPLAZO DE LA JUNTA DE LA PUERTA
JUNTA DE BARRIDO
FUNCIONAMIENTO
AJUSTE DE LA JUNTA DE BARRIDO
AJUSTE DE LA JUNTA DE BARRIDO
CIERRAPUERTA
CALENTADOR ANTICONDENSACIÓN DE ABERTURA DE LA PUERTA
REEMPLAZO DEL ALAMBRE CALEFACTOR
RETIRO DE LA GUARNICIÓN DE ACERO INOXIDABLE
INSTALACIÓN DEL CALENTADOR DE REEMPLAZO
REEMPLAZO DE LA GUARNICIÓN DE ACERO INOXIDABLE
REEMPLAZO DEL UMBRAL
CONEXIÓN ELÉCTRICA
LIMPIEZA DE LOS PANELES Y RECOMENDACIONES DE MANTENIMIENTO
Nota: RSG recomienda tomar fotos después de terminada la instalación.
1). Sección de la puerta exterior (vista general)
Comuníquese con el Departamento Técnico:
Norlake: 800-388-5253
Master-Bilt: 800-684-8988
Diagrama de montaje
Etiqueta de inspección de RSG y número de pieza específico del panel
Page 1/104
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20
Page 21
Page 22
Page 23
Page 24
Page 25
Page 26
Page 27
Page 28
Page 29
Page 30
Page 31
Page 32
Page 33
Page 34
Page 35
Page 36
Page 37
Page 38
Page 39
Page 40
Page 41
Page 42
Page 43
Page 44
Page 45
Page 46
Page 47
Page 48
Page 49
Page 50
Page 51
Page 52
Page 53
Page 54
Page 55
Page 56
Page 57
Page 58
Page 59
Page 60
Page 61
Page 62
Page 63
Page 64
Page 65
Page 66
Page 67
Page 68
Page 69
Page 70
Page 71
Page 72
Page 73
Page 74
Page 75
Page 76
Page 77
Page 78
Page 79
Page 80
Page 81
Page 82
Page 83
Page 84
Page 85
Page 86
Page 87
Page 88
Page 89
Page 90
Page 91
Page 92
Page 93
Page 94
Page 95
Page 96
Page 97
Page 98
Page 99
Page 100
Page 101
Page 102
Page 103
Page 104
Contents
Table of Contents
Search
Previous
Next
Bookmarks
Walk
-
In I
nstallat
ion Manual
Nor
l
ake
®
Kold Lock
er
™
, Fast
-
Trak
®
, Finelin
e
™
,
Envi
ro
-
Line &
Mini R
oom
s
Master
-
Bilt
®
QS Series,
Quick Ship,
Bilt2Spe
c
™
&
Ready
-
Bilt
™
Loading ...
Loading ...
Loading ...
File type: PDF
File name: 32003423_klb8488-c.pdf
File size: 6.76 MB
File Language: English
Pages: 104
Author: Nor-Lake
File created: 2022-08-25
Published:
2023-04-12
Updated: 2023-04-12
Download File
Other documents for Nor-Lake KLB8488-C
The following documents are available:
User Manual
Owner s manual - (English)
Read Online
|
Download pdf
Capsule pal eco manual - (English)
Download
Capsule pak manual - (English)
Download
Other Documents
Nor lake klb8488 c.specsheet - (English)
Download
Flyer - (English)
Download
Warranty - (English)
Download
Capsule pak spec sheet - (English)
Download
Capsule pak eco refrigeration spec - (English)
Download
Nor lake klb8488 c.specsheet - (English)
Download
Photos
Photos:
View Photos
Specifications
Brand:
Nor-Lake
Model: KLB8488-C
Category:
Air Conditioners
View in the file:
Full Specifications
See other models:
KLB8768-C
KLB7488-C
KODB8766-C
KLB7768-C
KLB84610-C
Related Products
Nor-Lake KLB88-C
Nor-Lake KLB8468-C
Nor-Lake KLB7488-C
Nor-Lake KLB8768-C
Nor-Lake KLB8788-C
Nor-Lake KLF68-C
Nor-Lake KLF88-C
Nor-Lake KLB68-C
Nor-Lake KLF7748-C
Nor-Lake KLF7788-C
Nor-Lake KLF8768-C
Nor-Lake KLF7768-C
Nor-Lake KLF8788-C
Nor-Lake KLB8466-C
Nor-Lake KLB7468-C
Table of Contents
×
Introduction
3
PRODUCT SAFETY POLICY
4
TOOLS REQUIRED FOR UNCRATING AND INSTALLATION OF YOUR RSG WALK-IN
5
UNPACKING / INSPECTION
6
Standard Walk-in panels Refrigeration System with Control Panel
6
FOAM PANEL STORAGE
8
CONSTRUCTION DIAGRAM
9
SECTION LATCHES
10
TO OPERATE LATCHES
10
SITE SELECTION, BASE PREPARATION AND LEVELING THE FLOOR WALK-IN COOLER OR FREEZER WITH A FLOOR
11
FLOOR INSTALLATION (Shim Leveling Method)
12
DO NOT LOCK!
13
SITE SELECTION, BASE PREPARATION
14
Figure 1
14
ALTERNATE SHIMMING METHOD FOR 1’’ VINYL SCREED
17
SITE SELECTION, BASE PREPARATION
18
Figure 1
18
SEALER GUIDE INSTALLATION
20
FOAMED SEALER (Screed) INSTALLATION
20
Figure 5
21
WALK-IN INSTALLATION
22
WALL AND CEILING PANEL CONSTRUCTION
22
DO NOT SHORT-CUT! TAKE ENOUGH TIME TO PROPERLY ALIGN ALL SECTIONS.
23
PANEL INSTALLATION ORDER
25
DOOR/DOOR SECTION
26
SLAM BRACES
27
EXTERIOR RAMP INSTALLATION INSTRUCTIONS
30
INTERIOR RAMP INSTALLATION INSTRUCTIONS
31
Step 2
31
Step 3
31
MEMBRANE ROOF INSTALLATION INSTRUCTIONS
32
Step #1
32
Step #2
32
Step #3
32
Step #4
32
Electrical Connections
33
WIRING
33
It is the electrical contractor's responsibility to provide the necessary wiring, connections, conduit and fittings to complete the hook-up.
33
POSITIONING THE THERMOMETER SENSING BULB
34
PRESSURE RELIEF PORT
34
WALK-IN DOOR WITH NL508 LIGHT SWITCH WIRING DIAGRAM
36
WALK-IN DOOR WITH NL708 LIGHT SWITCH WIRING DIAGRAM
37
ADJUSTING DOOR HINGE ON NORLAKE WALK-INS
38
ADJUSTING DOOR HINGE ON MASTER-BILT WALK-INS
38
REPLACEMENT OF THE MAGNETIC DOOR GASKET ASSEMBLY
39
DOOR ASSEMBLY REMOVAL - ALL FOAMED WALK-IN COOLER OR FREEZERS WITH CAM LIFT HINGES
39
RESETTING SPRING HINGES
39
DOOR GASKET REPLACEMENT
40
SWEEP GASKET
41
OPERATION
41
ADJUSTING THE SWEEP GASKET
41
ADJUSTING THE SWEEP GASKET
41
DOOR CLOSER
42
ANTI-CONDENSATE DOOR OPENING HEATER
43
HEATER WIRE REPLACEMENT
43
STAINLESS STEEL TRIM REMOVAL
44
INSTALLATION OF THE REPLACEMENT HEATER
45
STAINLESS STEEL TRIM REPLACEMENT
46
THRESHOLD REPLACEMENT
46
ELECTRICAL CONNECTION
47
PANEL CLEANING AND MAINTENANCE RECOMMENDATIONS
47
Note: RSG recommends pictures be taken after the installation is complete.
49
1). Exterior door section (full view)
49
Contact Technical Department:
49
Norlake: 800-388-5253
49
Master-Bilt: 800-684-8988
49
Construction Diagram
9
RSG Inspection Label and Panel Specific Part Number
9
132617 Walk-in Manual-SPANISH.pdf
0
Introducción
55
POLÍTICA DE SEGURIDAD DEL PRODUCTO
56
HERRAMIENTAS NECESARIAS PARA DESEMBALAR E INSTALAR SU CÁMARA FRIGORÍFICA RSG
57
DESEMBALAJE E INSPECCIÓN
58
Paneles de cámaras frigoríficas estándar Sistema de refrigeración con panel de control
58
ALMACENAMIENTO DEL PANEL DE ESPUMA
60
DIAGRAMA DE MONTAJE
61
CERROJOS DE SECCIÓN
62
PARA OPERAR LOS CERROJOS
62
SELECCIÓN DEL LUGAR, PREPARACIÓN DE LA BASE Y LA NIVELACIÓN DEL PISO CÁMARA FRIGORÍFICA O CÁMARA CONGELADORA CON PISO
63
INSTALACIÓN DEL PISO (Método de nivelación por calce)
64
SELECCIÓN DEL LUGAR, PREPARACIÓN DE LA BASE
66
Figura 1
66
MÉTODO DE CALCE ALTERNATIVO PARA ENRASE DE VINILO DE 2,5 CM
69
SELECCIÓN DEL LUGAR, PREPARACIÓN DE LA BASE
70
Figura 1
70
INSTALACIÓN DE GUÍA PARA SELLADOR
72
INSTALACIÓN DEL SELLADOR DE ESPUMA (enrase)
72
Figura 5
73
INSTALACIÓN DE LA CÁMARA FRIGORÍFICA
74
MONTAJE DE LOS PANELES DE PARED Y TECHO
74
¡NO TOME ATAJOS! TÓMESE EL TIEMPO SUFICIENTE PARA ALINEAR CORRECTAMENTE TODAS LAS SECCIONES.
75
ORDEN DE INSTALACIÓN DEL PANEL
77
PUERTA Y SECCIÓN DE LA PUERTA
78
RIOSTRAS DE SOSTÉN
79
INSTRUCCIONES DE INSTALACIÓN DE LA RAMPA EXTERIOR
82
INSTRUCCIONES DE INSTALACIÓN DE LA RAMPA INTERIOR
83
Paso 2
83
Paso 3
83
INSTRUCCIONES DE INSTALACIÓN DE TEJADO DE MEMBRANA
84
Paso 1
84
Paso 2
84
Paso 3
84
Paso 4
84
Conexiones eléctricas
85
CABLEADO
85
Es responsabilidad del contratista eléctrico proveer el material de cableado necesario, conexiones, conductos y accesorios para realizar el acoplamiento.
85
UBICACIÓN DEL BULBO SENSOR DEL TERMÓMETRO
86
PUERTO DE ALIVIO DE PRESIÓN
86
AJUSTE DE LA BISAGRA DE LA PUERTA EN CÁMARAS FRIGORÍFICAS NORLAKE
90
AJUSTE DE LA BISAGRA DE LA PUERTA EN CÁMARAS FRIGORÍFICAS MASTER-BILT
90
REEMPLAZO DEL CONJUNTO DE JUNTAS MAGNÉTICAS DE LA PUERTA
91
EXTRACCIÓN DEL CONJUNTO DE LA PUERTA: TODAS LAS CÁMARAS FRIGORÍFICAS Y CONGELADORAS CON ESPUMA PLÁSTICA Y BISAGRAS ACCIONADAS POR LEVAS DE ALZAMIENTO
91
RESTABLECIMIENTO DE LAS BISAGRAS CON RESORTE
91
REEMPLAZO DE LA JUNTA DE LA PUERTA
92
JUNTA DE BARRIDO
93
FUNCIONAMIENTO
93
AJUSTE DE LA JUNTA DE BARRIDO
93
AJUSTE DE LA JUNTA DE BARRIDO
93
CIERRAPUERTA
94
CALENTADOR ANTICONDENSACIÓN DE ABERTURA DE LA PUERTA
95
REEMPLAZO DEL ALAMBRE CALEFACTOR
95
RETIRO DE LA GUARNICIÓN DE ACERO INOXIDABLE
96
INSTALACIÓN DEL CALENTADOR DE REEMPLAZO
97
REEMPLAZO DE LA GUARNICIÓN DE ACERO INOXIDABLE
98
REEMPLAZO DEL UMBRAL
98
CONEXIÓN ELÉCTRICA
99
LIMPIEZA DE LOS PANELES Y RECOMENDACIONES DE MANTENIMIENTO
99
Nota: RSG recomienda tomar fotos después de terminada la instalación.
101
1). Sección de la puerta exterior (vista general)
101
Comuníquese con el Departamento Técnico:
101
Norlake: 800-388-5253
101
Master-Bilt: 800-684-8988
101
Diagrama de montaje
61
Etiqueta de inspección de RSG y número de pieza específico del panel
61
Search:
×
Search