DCS RF15IL3 15 Inch Freestanding/Built-In Undercounter Clear Ice Maker with Sound-Buffering Deflector, White LED Lighting, Eco Ice Mode, Delay Start Mode, Door Alarm, 39 Lbs Daily Ice Production, Drain Required, CSA, and UL Listed: Left Hinge

Installation Guide / User Guide - Page 25

For RF15IL3.

PDF File Manual, 30 pages, Read Online | Download pdf file

RF15IL3 photo
Loading ...
Loading ...
Loading ...
25
Drain Pump Removal Instructions:
1. Unplug the ice machine from the electrical supply and
remove the rear access cover from the ice machine.
2. Remove the front panel and the toe grille from the front
of the ice machine. See Figures 35 and 35a.
3. Remove the front and rear drain pump brackets. See
Figures 36, 36a and 37.
4. Unscrew the 3 hose clamps and remove the 3 hoses
from the front of the drain pump. (See Figure 34).
5. Unscrew the leveling leg in the back corner until the

nut insert in the base. (see Figure 34).
To Restart the Ice Machine
1. Reconnect or turn on the water supply line.
2. Reconnect drain tubing if removed.
3. Plug in the power cord to a wall outlet and turn the
ice machine on, (refer to page 16 for turning the ice
󰀨
4. 
water leaks.
5. 

storage bin. The drain pump should activate and
discharge water (refer to Drain Pump on page 7).
Check for water leaks at all hose connections.
14. Remove the top clamp from the vent tube, for easier
access for the air hose.
15. Apply air pressure (approximately 10 psi) to the end of
the vent tube which will purge the remainder of the
water from the drain pump and the drain line. (See
Figure 33).
16. Reinstall the vent tube and clamp to the back of the ice
machine and remove the winterization plug from the ice
bin and save it for future use.
Figure 33
Vent
tube
Remove
clamp
screw
Drain
line
PREPARING THE ICE MACHINE FOR STORAGE
Unscrew the
leveling leg so
the end of the

with the top of
the nut insert.
Remove
these 3 hose
clamps, then
remove the
3 tubes from
the drain
pump
Drain pump ground
wire connection
Figure 34
Loading ...
Loading ...
Loading ...