20108SB Southbend

User Manual - Page 6

For 20108SB.

PDF File Manual, 28 pages, Read Online | Download pdf file

20108SB photo
Loading ...
Loading ...
Loading ...
6
Printed in USA 12/02
Refrigerated Base-Self-Contained © 2002
OPERATION
PREPARATION FOR AN EXTENDED PERIOD
OF INACTIVITY
This unit is designed for continued use at automatically
cycled intervals. However, in the event of an extended shut
down, both the mechanical refrigeration system and the food
storage compartment system must be serviced.
Table 2.4 - Shut Down Procedures for an Extended Period
Operation Results
1. Fully close discharge valve at the receiver.
2. Fully close suction valve at the compressor.
3. Disconnect power supply.
4. Clean and wipe dry the food storage compartment.
Compressor will pump liquid refrigerant from system
to receiver.
This will isolate the refrigerant between the two valves.
De-energizes the system.
This will reduce the odor buildup during shut down.
Loading ...
Loading ...
Loading ...