Tripp Lite SR12UBEXPNDKD SmartRack 12U Standard-Depth 4-Post Open Frame Rack

Owner's Manual - Page 6

For SR12UBEXPNDKD.

PDF File Manual, 28 pages, Read Online | Download pdf file

SR12UBEXPNDKD photo
Loading ...
Loading ...
Loading ...
6
Equipment Installation
The SR12UBEXPNDKD can support a maximum equipment load up to 1,000 lb.
Warning: Do not install equipment until you have stabilized the enclosure. Install heavier equipment first and install it towards the
bottom of the enclosure. Install equipment starting from the bottom of the enclosure and proceeding toward the top of the
enclosure - never the reverse. If using sliding equipment rails, be careful when extending the rails. Do not extend more than one set
of sliding equipment rails at one time. Avoid extending sliding equipment rails near the top of the enclosure.
For all other equipment mounting, please refer to the intended equipment’s Owner’s Manual for equipment installation instructions. This
information can often be found in the “Mounting” or “Rackmounting” sections of the manual.
Installing or Removing Cage Nuts
To Remove Cage Nuts, Reverse Steps 1-3
Note: You may wish to use a cage nut tool (user-supplied) to aid cage nut installation and removal.
WARNING: The flanges of the cage nuts should engage the sides of the square opening in the rail, not the top and bottom. Follow the
instructions in your equipment documentation to ensure proper installation of your equipment.
1
Locate the numbered square openings in the mounting rails where you plan to install
your equipment. You will install cage nuts (included) into the square openings in order to
provide an attachment point for the mounting screws (included).
Note: Consult your equipment documentation to determine how many cage nuts will be required and
where they will need to be installed.
2
From the inside of the mounting rail, insert one of the flanges of the cage nut through
the square opening. Press it against the side of the square opening. Each flange should
engage one side of the square opening, not the top or bottom.
3
Compress the cage nut at the sides slightly to allow the remaining flange to fit through the
square opening. When the cage nut is properly installed, both flanges will protrude through
the square opening and will be visible on the outer surface of the mounting rail. Repeat
steps 1-3 until all required cage nuts are installed.
4
After installing the required cage nuts, use the included black mounting screws and cup
washers to secure your equipment to the rack rail. Place the cup washers between the
screws and the equipment mounting brackets.
Note: Your equipment may also include mounting hardware. Read the mounting instructions that
came with your equipment before installing your equipment.
2
3
2
2
2
1
1
2
3
4
Loading ...
Loading ...
Loading ...