Bosch HSLP751UCC/03 Single Wall Oven 30'' Stainless Steel HSLP751UCC

Instructional Manual - Page 9

For HSLP751UCC/03. Series: 500/800/Benchmark Series
Also, The document are for others Bosch models: HBL5751UC*, HBL8751UC*, HBLP751UC*, HSLP751UC*

PDF File Manual, 60 pages, Read Online | Download pdf file

HSLP751UCC/03 photo
Loading ...
Loading ...
Loading ...
Combination Oven Pre-Assembly
English 4 9001080875 Rev A
Preparation
Before You Begin
Tools and Parts Needed
Phillips-head screwdriver
Star-head screwdriver (T20)
Measuring tape
Drill with bit (1/8")
•Gloves
General Information
Power Requirements
The outlet must be properly grounded in accordance with
all applicable codes.
For Best Installation
The oven can be difficult for two people to handle during
installation. It is recommended that three or more people
be available to assist with lifting the unit into place.
Removal of the lower oven door (to significantly reduce the
unit weight and to provide necessary hand holds) can be
cumbersome unless the detailed door removal instructions
are followed carefully. Do not attempt to remve the speed
microwave door or steam convection oven door.
Please take time to read and follow the instructions
provided for an improved installation experience.
Checklist
Use this checklist to verify that you have completed each
step of the installation process. This can help you avoid
mistakes.
___ 1. Before installing the oven, be sure to verify the
cabinet dimensions are correct and the required
electrical connections are present.
___ 2. Refer to additional information in this manual
regarding Safety, Cabinet Dimensions, Removing
Packaging, Electrical Installation, Testing the
Installation, and Customer Service.
___ 3. Remove the lower oven door to reduce the unit
weight and to provide access to handholds for
lifting. See “Remove Lower Oven Door Prior to
Installation” on page 11.
___ 4. Move the oven units into place in front of the
cabinet opening, leaving the bottom packaging on
the units to avoid damaging flooring.
___ 5. Remove the star-head (T-20 size) screws holding
the speed microwave oven or steam convection
oven to the base of its carton (using Star-head
screwdriver).
___ 6. Assemble the two units of the combination oven.
See “Pre-Assembly of the Combination Oven” on
page 7.
___ 7. Connect the power cable from the lower oven to
the junction box in the cabinet.
___ 8. Remove the star-head (T-20 size) screws holding
the lower oven to the base of its carton (using Star-
head screwdriver).
___ 9. Team-lift the unit directly into the cabinet cutout
taking care not to pinch fingers or scratch hands or
arms.
__ 10. Slide the unit all the way into place.
__11. Fasten the combination unit to the cabinetry
opening with the screws supplied (using Philips
screwdriver).
__ 12. Reinstall the oven door removed in step 3 above.
__ 13. Consult the complete installation instructions and
follow the remainder of the procedures listed,
including performing an operation test.
__ 14. INSTALLER - Leave the literature pack and the
accessories with the customer.
Loading ...
Loading ...
Loading ...