Broan B160E65RS AI Series 160 CFM Energy Recovery Ventilator ERV

USER AND INSTALLER MANUAL - Page 11

For B160E65RS. Series: AI Series
Also, The document are for others Broan models: B110H65RT, B110H65RS, B130H65RT, B130H65RS, B130E65RT, B130E65RS, B150H75NT*, B150H75NS*, B160H75RT, B160H75RS, B160H65RT, B160H65RS, B150E75NT*, B150E75NS*, B160E75RT, B160E75RS B110H65RT, B160E75RS, B110H65RT, B160E65RT

PDF File Manual, 52 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
11
2.6.1 DUCTS CONNECTION
VD0489
CORRECT INSTALLATION
VD0490
INCORRECT INSTALLATION
IMPORTANT: Make sure to connect ducting as illustrated below to get airflows reading accuracy. Correct installation will also allow
proper drainage of water that may accumulate in ducting.
Insulated ducts must have the same diameter as the ports to ensure proper drainage of water that may accumulate in ducts.
CAUTION
Ducting must not be too crushed. Otherwise, airflows reading accuracy will be affected.
CAUTION
R = 3" minimum
NOTE: Route ducts as straight as possible, minimize the number of elbows and design and install ducts in accordance with
ACCAs Manual D.
Loading ...
Loading ...
Loading ...