6.0
Uncrating and assembly
1. Finish uncrating the band saw. Contact your
distributor if any damage has occurred during
shipping.
2. Remove any preservative with kerosene or
diesel oil. Do not use gasoline, paint thinner, or
any cellulose-based product, as these will
damage painted surfaces.
3. Remove two socket head cap screws from left
side of vertical column. Attach shear assembly
(A, Figure 1) to column by inserting screws.
4. Place rip fence onto table and tighten with
locking knob.
Figure 1
7.0 Installation
1. Remove four (4) nuts and washers holding
band saw to shipping crate bottom.
2. Use the lifting ring to lift band saw into its
permanent location. For best performance,
band saw should be bolted to floor after a level
position has been found.
3. Using a square, adjust table 90 degrees to
blade, both front to back and side to side.
Loosen the hex cap screws below the table to
move it and tighten to hold table in place. If
necessary, adjust the pointers to zero should
they read different once table is perpendicular
to blade in both directions.
4. To level the machine, place a machinist's level
on the table and observe in both directions.
5. Use metal shims under the appropriate hold
down screw. Tighten screw and recheck for
level.
6. Adjust with additional shims, as required, until
table is level when all mounting screws (or
nuts) are tight.
8.0 Electrical connections
All electrical connections
must be done by a qualified electrician. All
adjustments or repairs must be done with
machine disconnected from power source.
Failure to comply may cause serious injury.
The VBS-2012 Band Saw is rated at 230/460V and
comes from the factory prewired 230V.
You may either connect a proper UL-listed plug
suitable for 230 volt operation, or "hard-wire" the
machine directly to your electrical panel provided
there is a disconnect near the machine for the
user.
The band saw must be grounded. A qualified
electrician can make the proper electrical
connections and confirm the power on site is
compatible with the saw.
Before connecting to power source, make sure
switch is in off position.
8.1 Voltage conversion
To switch to 460V operation:
1. Change jumper settings at the control panel
(follow wiring diagram on machine, or sect.
19.0 of this manual).
2. Switch the jumper wires on the circuit board.
Remove control panel from saw body and
change the jumper wires according to the list
in section 19.0, Electrical Connections.
3. If a plug is to be used, install a proper UL-
listed plug suitable for 460V operation.
IMPORTANT: Consult the diagrams in section 19.0
for any clarification of these changes on 230V to
460V conversion.
8.2 Three-phase test run
After wiring the band saw, you should check that
the wires have been connected properly. Connect
machine to power source and turn it on for an
instant to watch direction of blade movement.
If blade runs upward instead of downward,
disconnect machine from power, and switch any
two of the three leads in the motor junction box
(see section 19.0, Electrical Connections).