Waldorf RNB8110GC Bold 900mm Gas Target Top Convection Oven Range

Installation Operation Manual - Page 22

For RNB8110GC.

PDF File Manual, 29 pages, Read Online | Download pdf file

RNB8110GC photo
Loading ...
Loading ...
Loading ...
20
Gas Conversion and Specifications
Convection Oven
1. Carry out the following:-
 Remove lower lintel at front of oven.
 Open oven door and remove sole plate(s).
 Loosen clamp bracket and remove main
burner.
 Remove thermocouple and piezo igniter
from mounting bracket. (For access
purposes).
 Disconnect pilot supply tube from pilot
burner to access pilot injector.
2. With Main Burner removed, ensure aeration gap is adjusted for type
of gas being used as shown in ‘Gas Specifications Tables’ at end of
this section.
3. Remove pilot and main injectors and replace with correct size injectors as
shown in ‘Gas Specifications Tables’ at end of this section.
4. Refit the following:-
 Re-connect pilot supply tube to pilot burner.
 Re-connect piezo igniter and thermocouple to mounting bracket.
 Refit main burner and secure clamp bracket.
 Refit sole plate(s) and lower lintel.
NOTE: There is no 'Low Fire' adjustment on the gas control valve for the GC Oven.
 Refit the oven control panel.
Main Burner Injector
Pilot Burner
Piezo Igniter
Thermocouple
Main Burner
Aeration Slide
Burner Adjustment Screw
Loading ...
Loading ...
Loading ...