Renogy KIT-RBC2125DS-CORE-US

User Manual - Page 14

For KIT-RBC2125DS-CORE-US.

PDF File Manual, 36 pages, Download pdf file

Loading ...
Loading ...
Loading ...
— 10 —
Step 1. Plan a Mounting Site
The battery charger requires adequate clearance for installation, wiring, and ventilation. The
minimum clearance is provided below.
5.91 in
(150 mm)
5.91 in
(150 mm)
5.91 in
(150 mm)
FRAGILE
VENTILATION
0% to 95%
-31°F to 176°F
-35°C to 80°C
Solar
Vehicle
Stage
Battery
5.91 in
(150 mm)
Solar
Vehicle
Stage
Battery
The battery charger should be installed on a flat surface protected from direct sunlight.
Loading ...
Loading ...
Loading ...