Waldorf RN8100G-LS 800 Series 900mm Gas Target Top Leg Stand

Installation Operation Manual - Page 22

For RN8100G-LS.

PDF File Manual, 30 pages, Read Online | Download pdf file

RN8100G-LS photo
Loading ...
Loading ...
Loading ...
20
NOTE:
These conversions should only be carried out by qualified persons. All connections must
be checked for leaks before re-commissioning appliance.
Adjustment of components that have adjustments / settings sealed (e.g. paint sealed) can
only be adjusted in accordance with the following instructions and shall be re-sealed
before re-commissioning this appliance.
For all relevant gas specifications refer to Gas Specification Tables at rear of this section.
Remove the following:-
Control knob from target top control panel.
Centre casting.
Two half plate castings.
Two front fire bricks.
R/H main fire brick.
1. Remove main burner to reveal inner and outer ring injectors.
2. Remove injectors and replace with correct size injectors as
shown inGas Specifications Tablesat rear of this section.
3. Refit main burner to target top.
NOTE: Ensure main burner is pulled fully towards front of unit
before tightening 2 main burner securing screws.
4. Set burner aeration screws Xand Yfor correct gas type
aeration, as shown in 'Gas Specifications Tablesat rear of this
section.
1. Disconnect gas supply tube from base of pilot
burner.
2. Remove pilot burner and thermo couple retaining
plate.
3. Remove pilot burner from mounting bracket.
4. Remove injector and spring from pilot burner and
replace with correct size injector as shown inGas
Specifications Tablesat rear of this section.
5. Refit pilot burner to retaining bracket - ensuring
pilot burner ports are at same height as
thermocouple.
Main Burner
Injectors
Pilot Burner
Gas Supply
Tube
Loading ...
Loading ...
Loading ...