Loading ...
Loading ...
Loading ...
Open the gas side stop valve.
Open the liquid side stop valve.
Electrify crank case heater for 6 hours.
Set to cooling operation with the remote control and start
operation by pushing ON/OFF button.
Turn off the main power supply after operation.
Check the following points. If there is any malfunction, please
resolve it according to the chapter "Troubleshooting" in the
"Owner's Manual".
1
2
3
4
5
6
7 TEST OPERATION
Refer to ''For the following items, take special care during construction
and check after installation is finished'' on page 2.
After finishing the construction of refrigerant piping, drain piping, and
electric wiring, conduct test operation accordingly to protect the unit.
Test operation after installing decoration panel
Make sure the control box lids are closed on the indoor and outdoor
units.
The indoor unit
- Whether the switch on the remote control works well.
- Whether the buttons on the remote control works well.
- Whether the air flow louver moves normally.
- Whether the room temperature is adjusted well.
- Whether the indicator lights normally.
- Whether the temporary buttons works well.
- Whether there is vibration or abnormal noise during operation.
- Whether the drainage flows smoothly.
The outdoor unit
- Whether there is vibration or abnormal noise during operation.
- Whether the generated wind, noise, or condensed of by the air
conditioner have influenced your neighborhood.
- Whether any of the refrigerant is leaked.
A protection feature prevents the air conditioner from being
activated for approximately 3 minutes when it is restarted
immediately after shut off.
16
Close the intake grille, and close the 2 grille hooks.
For more info visit www.mrcool.com
Loading ...