ISX2130SQB2 Kobe

User Manual - Page 7

For ISX2130SQB2.

PDF File Manual, 22 pages, Read Online | Download pdf file

ISX2130SQB2 photo
Loading ...
Loading ...
Loading ...
4
INSTALLATION
PLEASE READ ENTIRE INSTRUCTIONS BEFORE PROCEEDING
Calculation before Installation
To calculate installation, please refer to TABLE 1 (all calculations are in inches.)
- FOR ISLAND -
TABLE 1
A = Height of Floor to Ceiling
B = Height of Floor to Counter Top
(Standard: 36”)
C = Preferred Height of Counter Top to Hood
Bottom (Recommended 30” to 36”)
D = Height of Hood
E = Height of the Hood Installation
[A – (B+C)]
F = Height of Duct Cover
[E – D]
SAFETY WARNING
HOOD MAY HAVE SHARP EDGES; PLEASE WEAR PROTECTIVE GLOVES IF REMOVING
ANY PARTS FOR INSTALLING, CLEANING, OR SERVICING.
BE CAREFUL WHEN USING ELECTRICAL SCREWDRIVER, DAMAGE TO THE HOOD MAY
OCCUR. USING HAND TOOLS IS RECOMMENDED. DO NOT OVER TIGHTEN SCREWS.
MAKE SURE TO PREVENT ANY DEBRIS FROM ENTERING THE VENT OPENING TO AVOID
DAMAGE OR MALFUNCTION.
ISLAND INSTALLATION
**Installation videos available at www.koberangehoods.com**
1. Read any provided document(s).
2. Test the range hood by temporarily connecting to an outlet and turning ON the fan and lights.
3. If you run into any problems, contact KOBE Range Hoods.
4. This range hood has top 6” round exhaust.
5. Decide the location of the venting pipe from the hood to the outside. A straight, short vent run will
allow the hood to perform more efficiently. Try to avoid elbows, transitions, and long run as much
as possible as this may reduce the performance of the hood. Make sure that the duct work leads
to the outside.
Before I
nstallation
Venting Requirements
Loading ...
Loading ...
Loading ...