Ivation IVA-SWASHER

User Manual - Page 4

For IVA-SWASHER.

PDF File Manual, 8 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
Operation
Parts Assembly:
Attaching Brush/Shower Head:
1. Locate salient points on desired attachment.
2. Align points to corresponding holes on Spray Gun (15).
3. Press firmly to attach the two parts.
Replacing Internal Battery:
1. Locate screws on Battery Cover (11).
2. Using correct screwdriver, remove all screws.
3. Detach and remove old battery.
4. Connect new battery’s red clamp to red wire and black clamp to black wire.
5. Replace Battery Cover (11) and reinsert screws.
5. Connect Spray Gun
(15) to Hose (18).
4. Connect Hose (18) to
Hose Inlet (4).
1. Turn Tank Cover (2)
counterclockwise to remove.
2. Fill tank with clean
water 50°F to 104°F
3. Replace Tank Cover
(2) by turning clockwise.
4
Loading ...
Loading ...
Loading ...