Haier USYM09UCDSA Air Conditioner Cooling Area,

User Manual - Page 9

For USYM09UCDSA.

PDF File Manual, 48 pages, Download pdf file

Loading ...
Loading ...
Loading ...
31-5000493 Rev. 0 9
G.
Route the 14AWG stranded 4-conductor power/
communication cable and the wired remote cable
to the air handler. Be sure to secure wire using
strain relief. Use reducing washers and appropriate
connector to attach the power/communication cable
to the unit. The wired remote cable will enter the unit
through a rubber grommet. The 4 conductor cable
connects to the terminal block at terminals (L1),
2(L2), 3(C) and Ground. The wired remote cable
connects to the air handler main board at connector
CN1 (ABC). Re-install electrical box cover.
Installation Instructions
F. Connect the grey flexible drain hose supplied
to the condensate pump discharge pipe. Tighten
the clamp securely. Using 3/4 “ PVC, connect the
flexible hose to the building’s condensate drain
system.
Step 2 - Mounting the Unit
A. Determine location and use the template (shipped
in the box) to mark the location of threaded rods.
Install the hardware necessary to mount the
threaded rods. Always select a location strong
enough to support the entire weight.
B. Install threaded rods to the hardware attached to
the structure.
D. Using a level, adjust the readings on the threaded
rods to obtain level readings both side to side and
front to back.
C.
Lift the Ducted unit and position the threaded rods
into the four mounting foot on each corner.
E.
Ream both inside and outside of the refrigerant
tubing where a cut has been made. Use every
precaution to ensure reamed copper chips not to
lodge inside the tubing.
Install the factory-supplied flare nuts on the
refrigerant tubing using an R-410A flaring tool
ONLY. Apply a small amount of refrigerant oil to
the back of the flare and threads.
Tighten the flares with a torque wrench and back-
up wrench to the specifications found in the outdoor
unit Installation Manual.
Loading ...
Loading ...
Loading ...