Loading ...
Loading ...
Loading ...
5
INSTALLATION INSTRUCTIONS
This appliance must be properly installed and grounded by a qualified technician.
Unpacking the Cooktop
• Carefully unpack the cooktop from its shipping container. If possible, keep the original
shipping carton and protective packaging in the event the unit has to be returned for service.
• Verify the package contents. If the ceramic glass cooktop appears to be damaged or parts
are missing, call SUMMIT immediately.
NOTE: Do not remove the clear plastic covering film on the ceramic glass until the cooktop is ready
to be installed.
Electrical Supply Requirements
This product must be installed in accordance with national, state and local electric codes. Here are
the electrical requirements:
Model Number
CR4B242BK
CR4BV230B
LCR4B220B
Maximum Connected
Load
6000 W
Required Power Supply
Input
230V AC / 21A / 60Hz
The supply must be from an individual grounded circuit that is protected by a circuit breaker and
rated per the specifications as shown above.
Loading ...
Loading ...
Loading ...