GE - General Electric ZKUN Fully Integrated Refrigeration Freezer Heater and Unification Kit - SXS Installation

User Manual

For ZKUN.

PDF File Manual, 4 pages, Read Online | Download pdf file

ZKUN photo
31-1000195 Rev. 2 12-19 GEA
Installation
Instructions
ZKUN
Heater Unification Kit
Before you begin - Read these instructions completely and carefully.
Note to Installer: Be sure to leave these instructions with the Consumer.
Note to Consumer: Keep these instructions with your Installation Instructions for future reference.
WARNING
Tip Over Hazard. This
appliance is top heavy. Use extreme caution with moving
to prevent tipping over which could result in death or
serious injury.
WARNING
Electrical Shock Hazard.
To avoid the risk of electric shock, make sure the power
cord is not plugged into the wall outlet.
This kit provides for the installation of the Heater Unification components when installing 2 Column units side by side.
Parts List:
Adhesive Heater
Transformer
Front Mullion
Trim Bracket
Top Unification Bracket
Bottom Front Unification Bracket
3 1/4” Hex Head 8-18 5/8” Long Screws
5 1/4” Hex Head 8-32 5/8” Long Screws
5 3/8” Hex Head 1/4-20 1/2” Long Screws
4 wire clips
Tools and Materials Required:
1/4” and 3/8” driver / sockets
#2 Phillips screwdriver
Rubbing alcohol
Instructions for this kit are also included in the full installation instructions included with the unit.
Ŷ Unpack the heater Unification Kit (ZKUN) and make sure all of the components on the list are included.
1
Loading ...
Loading ...
Loading ...