Loading ...
Loading ...
ge.colTi
PROPERINSTALLATION
This dryer must be properly installed and located in accordance with the Installation Instructions
before it is used. tf blou did not receive an Installation Instructions sheet, you con receive one bg
visiting ge.com, or bg coiling 800.GE.CARES (800.432.2737).
[] Properlyground dryer to conform with all
governing codes and ordinances.Follow details
in Installation Instructions.
[] Installor store where it will not be exposed
to temperatures below freezing or exposed
to the weathen
[] Connectto a properly rated, protected and sized
power supply circuit to avoid electrical overload.
[] Removethe colored protective film from both
the control panel and the doon
[] Removeall sharp packing items and dispose
of all shipping materials properly.
[] Donot remove the vent protector from the back
of the dryer (on some models).
[] Pullthe protector out and down to its lowest
position and connect the exhaust duct to the dryer
Thelowered protector will prevent the duct from
getting crushed (onsome models).
Exhaust/Ducting:
ITI DryersMUSTbe exhausted to the outside to
prevent large amounts of moisture and lint from
being blown into the room.
I_] Useonly rigid metal or flexible metal 4" diameter
L_J
ductwork insidethe dryer cabinet or for
exhausting to the outside.USEOFPLASTICOR
OTHERCOMBUSTIBLEDUCTWORKCANCAUSE
A FIRE.PUNCTUREDDUCTWORKCANCAUSEA
FIREIF ITCOLLAPSESORBECOMESOTHERWISE
RESTRICTEDIN USEORDURINGINSTALLATION.
Forcomplete details,follow the Installation
Instructions.
Loading ...
Loading ...
Loading ...