Stock No.
08222, 08216, 08221
41” Workbench Roller
Tool Cabinet, 7 Drawer
To make assembly easier we recommend having
two persons aid one another in assembly.
STEP 1: ATTACH CABINET HANDLE
• Position the cabinet handle over the holes on the cabinet.
• Attach with (4) M6 x 16mm bolts and tighten with
supplied hex key.
STEP 2: ATTACH CASTOR
• Be sure the drawers are locked and place the cabinet
upside down.
• Secure castors to the unit using the (4) M8 x 25mm bolts
and tighten with supplied hex key.
• Repeat this process on the opposite side of the cabinet.
REMOVING AND REPLACING
THE DRAWERS
• Pull the drawer completely out.
• Press down the left tab and lift up the right tab.
• Pull drawer o slides.
• To reinstall the drawer, realign with the internal drawer
slide and push in until locked in place.
CASTOR MAINTENANCE
• Grease the castors annually using high-quality bearing grease.
CARE AND CLEANING
• Periodically the surfaces should be cleaned with a mild detergent
and water. Grease and oil can be removed with most standard
cleaning uids. For safety, use a non-ammable cleaning uid.
• Auto wax will preserves the storage unit’s luster nish and
protects against scratches.
(L)
(R)
drapertools.com
Draper Tools Limited, Hursley Road, Chandler’s Ford, Eastleigh, Hampshire. SO53 1YF UK
Loading ...
Loading ...
Loading ...