nal position.
Once the previous steps are complete, move the unit into its
5
If the units are to be installed inside an enclosed structure,
it is necessary to design a ventilation shaft at the back of
the enclosure to assure proper ventilation at the back of the
the unit into its nal position inside the enclosure or structure.
Check the levelling of the appliance, adjusting its feet and
wheels to correct it if necessary.
6
7
unit. A 1/4” gap is sufcient to prevent overheating. Always
mount front panels on the door and drawer before moving
To make this operation easier keep the door and the drawer
previously installed side proles.
open.
Secure the appliance to the adjacent cabinets using the
Mount the included covers by rst inserting them laterally
then pushing rmly until a “click” is heard.