NewAir NWB080SS00 24” Premium Built-in Dual Zone 20 Bottle and 60 Can French Door Wine and Beverage Fridge in Stainless Steel with SplitShelf and Beech Wood Shelves

User Manual - Page 5

For NWB080SS00.

PDF File Manual, 12 pages, Read Online | Download pdf file

NWB080SS00 photo
Loading ...
Loading ...
Loading ...
5
ASSEMBLY INSTRUCTIONS
INITIAL SETUP
Remove exterior and interior packing materials and let the fridge stand for 24
hours before connecting to power, to allow refrigerant to settle. Once it is
plugged in, let it run for at least 30 minutes before stocking. Do not change the
temperature or adjust any settings during this time.
INSTALLATION OF YOUR APPLIANCE
Use two or more people to move and install the fridge. Failure to do so can
result in back or other injury.
Place your fridge on a floor that is strong enough to support it when it is
fully loaded.
Choose a well-ventilated area with temperatures above 60 and below
90.
This fridge is designed for built-in, recessed or freestanding installation.
For built-in installation, leave a 1/4” (6.35mm) space on each side and at
the top of the fridge to ensure proper air circulation to cool the
compressor and condenser.
For freestanding installation, leave the proper clearance around the fridge.
Below are the recommended clearances:
Side: 3/4” (19mm); Top: 4” (100mm); Back: 2” (50mm)
Even for built-in installation, you must keep space on each side and at the
top. If you plan to use the unit for a built-in application please leave at
least 0.25 in of space on all sides.
The fridge must be installed with all electrical, water and drain connections
in accordance with state and local codes.
Make certain that the pipes are not pinched, kinked or damaged during
installation. Check for leaks after connection.
Loading ...
Loading ...
Loading ...