Loading ...
Loading ...
Loading ...
10 49-5000633 Rev.0
Installation Instructions
BEFORE YOU BEGIN
Read these instructions completely and carefully.
IMPORTANT – Save these
instructions for local inspector’s use.
IMPORTANT – Observe all
governing codes and ordinances.
Note to Installer – Be sure to leave these
instructions with the Consumer.
Note to Consumer – Keep these instructions for
future reference.
Skill level – Installation of this appliance requires
basic mechanical skills.
• Completion time Approximately 1 hour
We recommend that two people install
this product.
Proper installation is the responsibility
of the installer.
Product failure due to improper installation is not
covered under the Warranty.
 <RX0867XVHDOOVXSSOLHGSDUWVDQGXVHSURSHU
installation procedures as described in these
instructions when installing this air conditioner.
Questions? Visit our Website at: GEAppliances.com
These models require a 115/120-volt AC,
60-Hz grounded outlet protected with a
15-amp time-delay fuse or circuit breaker.
The 3-prong grounding plug minimizes the possibility
of electric shock hazard. If the wall outlet you plan to
use is only a 2-prong outlet, it is your responsibility to
have it replaced with a properly grounded 3-prong wall
outlet.
CAUTION
Do not, under any circumstances, cut or remove the
third (ground) prong from the power cord.
Do not change the plug on the power cord of this air
conditioner.
Aluminum house wiring may present special
problems—consult a qualified electrician.
Power cord includes a current interrupter device. A
test and reset button is provided on the plug case. The
device should be tested on a periodic basis by first
pressing the TEST button and then the RESET button
while plugged into the outlet. If the TEST button does
not trip or if the RESET button will not stay engaged,
discontinue use of the air conditioner and contact a
qualified service technician.
ELECTRICAL
REQUIREMENTS
WARNING
EXCESSIVE WEIGHT HAZARD - When moving or
lifting the air conditioner, use two or more people.
Wear gloves when handling the air conditioner to
protect against possible sharp edges and metal fins.
Remove Packaging Materials
Remove packaging materials. Save the carton
and the foam packaging for storing the unit when
not in use.
NOTE: There is NO internal packing material
inside the air conditioner to remove - DO NOT
open the cabinet.
Handle the air conditioner gently.
Keep the air conditioner upright and level. Do not
set the air conditioner on its side, front, back or
upside down.
The air conditioner must be standing upright for 2
hours prior to installation and operation.
UNPACKING THE AIR
CONDITIONER
TOOLS YOU WILL NEED
Phillips head screwdriver
Ruler or tape measurePencil
Level
Scissors or knife
Drill and 1/8” drill bit
INSTALLATION INSTRUCTIONS
Loading ...
Loading ...
Loading ...