Loading ...
Loading ...
Loading ...
Window Installation Instructions
INSTALL THE CASE
IN THE WINDOW
(cont.)
Use a wood block (obtained locally) between
the leveling bolts and the wall if the wall is
weak or if the weight of the air conditioner
falls between the studs in the wall.
Adjust the leveling bolts and nuts against the
outside wall so that the case has a slight tilt
to the outside. Tighten nuts with an adjustable
wrench. Use a level; no more than a 1/2 bubble
will be the correct case slant to the outside.
Extend the left and right accordion panels
to the vertical window sashes. Drill pilot
holes and attach the top and bottom corners
with 4 type D screws.
F
E
D
6
Type D
screw
Type D
screw
Type D
screw
Top mounting rail
Type D
screw
INSTALL SUPPORT BRACKETS
AND THE FOAM TOP WINDOW
GASKET
Drill pilot holes and attach the support
brackets with two type D screws, one on
each side.
Cut the foam top window gasket to the
window width.
Stuff the foam between the glass and the
window to prevent air and insects from
getting into the room.
C
B
A
7
13
Loading ...
Loading ...
Loading ...