D-Link DIS-100G-5PSW Industrial Gigabit Unmanaged PoE Switch with SFP slot

User Manual

For DIS-100G-5PSW.

PDF File Manual, 4 pages, Read Online | Download pdf file

DIS-100G-5PSW photo
1
DIS-100G Series Unmanaged
Industrial Gigabit Ethernet
Switch
Quick Installation Guide
Overview
The DIS-100G unmanaged Industrial Gigabit Ethernet
Switch solutions are designed for supporting standard
industrial applications without complex setup to make the
network truly plug-and-play.
If the equipment is used in a manner not specied by the
manufacturer, the protection provided by the equipment
may be impaired.
Package Checklist
Please verify that the box contains the following items:
Item Quantity
Unmanaged switch 1
Wall-mount plates 2
DIN-Rail kit 1
M4 Screws
(for the wall mount plates & DIN Rail kit)
4
DC power terminal block 1
Quick Installation Guide 1
Safety Instructions
When a connector is removed during installation, testing, or
servicing, or when an energized fiber is broken, a risk of
ocular exposure to optical energy that may be potentially
hazardous occurs, depending on the laser output power.
The primary hazards of exposure to laser radiation from an
optical-fiber communication system are:
Damage to the eye by accidental exposure to a beam
emitted by a laser source.
Damage to the eye from viewing a connector attached
to a broken fiber or an energized fiber.
Documentation Conventions
The following conventions are used in this quick installation
guide to emphasize information that will be of interest to the
reader.
Danger The described activity or situation might or
will cause personal injury.
Warning The described activity or situation might or
will cause equipment damage.
Caution The described activity or situation might or
will cause service interruption.
Note The information supplements the text or
highlights important points.
DIN-Rail Mounting
Mounting step:
1. Screw the DIN-Rail bracket on with the bracket and
screws in the accessory kit.
2. Hook the unit over the DIN rail.
3. Push the bottom of the unit towards the DIN Rail until it
snaps into place.
Wall Mounting (unit: mm)
Mounting step:
1. Screw on the wall-mount plate on with the plate and
M4 screws in the accessory kit.
2
3
Loading ...
Loading ...
Loading ...

Other documents for D-Link DIS-100G-5PSW

The following documents are available:
User Manual Other Documents Photos

Specifications