Schweigen PKUM422012SP2 120cm Classic Series Ceiling Cassette Rangehood with Twin External Motor UM4220-12SP2

User Manual - Page 5

For PKUM422012SP2.

PDF File Manual, 24 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
Page 5
2. Your Safety
Before Installation
1. We recommend this appliance be installed or repaired by a qualied Schweigen Home
Appliances technician.
2. Please see our website www.schweigen.com.au for recommended installers.
3. It is dangerous to modify any part of this appliance. Modication of any kind, will immediately
void the warranty.
4. The manufacturer declines all responsibility in case of failure to adopt proper safety measures.
5. Ensure that the location in which this appliance is installed, has good and permanent ventilation.
6. Please consult local laws and regulations and install in accordance.
7. Use an electrical connector with earth that is correct for your location.
8. Check that the voltage in your area corresponds to the appliance as indicated on the rating
label.
9. This appliance must be connected to an electricity supply with a ground connection.
10. Check that the installation and electrical connections are made by a qualied technician and
that the indicated instructions and local regulations in force are met, using materials that are
compliant with the applicable legislation.
11. The company will not be responsible for installations executed by non-qualied staff and
installations that fail to heed the applicable legislation on electrical safety (with regard to both
modes and materials).
12. The electrical technical data can be found inside the rangehood, after removing the grease lters.
13. The exible power cable supplied is already connected internally and emerges from the
rangehood near the air outlet tube.
14. Before installing the electrical connections, you should:
• Verify that the indicated electrical data coincide with the voltage values and frequency of the
electrical circuit in the house where the rangehood is to be installed;
• Check that the premises has electrical protection against short circuits and electrocution,
pursuant to the applicable legislation;
• Always switch off the current using the double-pole switch before maintenance and turn the
power on again for normal use only when the operation has been completed.
Loading ...
Loading ...
Loading ...