NewAir ABR1770 24 Inch Stainless Steel Beverage Center

User Manual - Page 6

For ABR1770.

PDF File Manual, 11 pages, Read Online | Download pdf file

ABR1770 photo
Loading ...
Loading ...
Loading ...
6
http://www.NewAir.c om
ELECTRICAL CIRCUIT D IAGRAM
INSTALLATION
Before connecting the appliance to a power source, let it stand
upright for approximately 2 hours. This will reduce the possibility
of a malfunction in the cooling system from handling during
transportation.
Before operating your cooler for the first time, follow these steps:
Remove the exterior and interior packing.
Clean the interior surface of the unit with lukewarm water and a soft cloth.
Place the cooler on a level surface that will be strong enough to support the
unit when it is fully loaded. To level your cooler, adjust the front feet located
at the bottom of the unit.
Loading ...
Loading ...
Loading ...