Maytag MBL2562HES refrigerator

User Manual - Page 11

For MBL2562HES.

PDF File Manual, 32 pages, Download pdf file

Loading ...
Loading ...
Loading ...
Connecting the Water Supply
(select models)
Materials Needed:
* '4" outer diameter flexible copper tubing
* Shut-off valve (requires a h" hole to be drilled into
water supply line before valve attachmenO
* Adjustable wrench
* '4" hex nut driver
* Add 8' to tubing length needed to reach water
supply for creation of service loop.
Create service loop with copper
tubing (minimum 2' diameteO.
Avoid kinks in the copper tubing
when bending it into a service
bop,
2' diameter
Remove plastic cap from water valve inlet
port.
Place brass nut (A} and sleeve (B} on
copper tube end as illustrated,
Reminder: Do not use an old
sleeve.
B
Place end of copper tubing into
water valve inlet port. Shape tubing
slightly, Do not kink - so that tubing feeds
straight into inlet port.
5. Slide brass nut over sleeve and screw nut
into inlet port. Tighten nut with wrench.
UMPORTANT: Do not overtighten. Cross
threading may occur.
Pull on tubing to confirm connection is
secure. Connect tubing to frame with
water tubing clamp (C) and turn on
water supply, Check for leaks and
correct if necessary. Continue to
observe the water supply connection
for two to three hours prior to moving
the refrigerator to its permanent
location.
7. Monitor water connection for 2/4 hours. Correct
leaks, if necessary.
10
Loading ...
Loading ...
Loading ...