Kenmore 11072082100 SENSOR SMART Gas Dryer KING SIZE Capacity Plus

Use & Care Guide - Page 11

For 11072082100.

PDF File Manual, 22 pages, Read Online | Download pdf file

11072082100 photo
Loading ...
Loading ...
Loading ...
3. Examine the leveling legs. Find the diamond marking.
1
4. Screw the legs into the leg holes by hand. Use a wrench to
finish turning the legs until the diamond marking is no longer
visible.
5.
Place a carton corner post under each of the 2 dryer back
corners. Stand the dryer up. Slide the dryer on the corner
posts until it is close to its final location. Leave enough room
to connect the exhaust vent.
6. Once connection is made and dryer is in final location,
remove corner posts and cardboard.
For mobile home use
Gas dryers must be securely fastened to the floor.
Mobile home installations require a Mobile Home Installation Kit.
See "Tools and Parts" section for ordering information.
Check the levelness of the dryer. Check levelness first
side-to-side, then front-to-back.
1.
2.
Remove the red cap from the gas pipe. Move the dryer close
to its final position.
Using a wrench to tighten, connect the gas supply to the
dryer. Use pipe joint compound on all non-flared male
threads. If flexible metal tubing is used, be sure there are
no kinks.
NOTE: For L.R gas connections, you must use pipe joint
compound resistant to the action of L.R gas. Do not use
TEFLON _ tape.
A combination of pipe fittings must be used to connect the
dryer to the existing gas line. Shown following is a
recommended connection. Your connection may be different,
according to the supply line type, size, and location.
1. S/Mn,flexible gas connector
2. _Mn. dryer pipe
3. _Mn. to _in. pipe elbow
4. _ in. pipe-to-flare adapter fitting
3. Open the shutoff valve in the supply line. The valve is open
when the handle is parallel to the gas pipe.
If the dryer is not level, prop up the dryer using a wood block.
Use a wrench to adjust the legs up or down and check again for
levelness.
NOTE: It might be necessary to level the dryer again after it is
moved into its final position.
1. Closed valve
2. Open valve
4. Test all connections by brushing on an approved
non-corrosive leak-detection solution. Bubbles will show a
leak. Correct any leak found.
11
Loading ...
Loading ...
Loading ...