Loading ...
Loading ...
Loading ...
![](https://files.manualsfile.com/56199769-nexse110dfbl-ch/bg22.png)
INSTALLATION
Check the appliance is gas sound when you have nished.
30
You will need the following equipment to complete the
cooker installation satisfactorily:
• * Restraining chain and hook:
If the cooker is to be supplied with gas through a
flexible hose, a restraining chain and hook MUST be
fitted.
• Flexible gas hose: Must be in accordance with the
• relevant standards.
• Gas pressure tester/manometer.
• Multimeter: For electrical checks.
You will also need the following tools:
1. Electric drill
2. Masonry drill bit (only required if tting the cooker on a
stone or concrete oor)
3. Wall plugs (only required if tting the cooker on a stone
or concrete oor)
4. Steel tape measure
5. Cross head screwdriver
6. Flat head screwdriver
7. Spirit level
8. Pencil
9. Adjustable spanner
10. 13 mm spanner or socket wrench
11. Screws for tting the restraining chain and bracket
3 pan supports Wok cradle
ArtNo.110-0002 110 pan supports
ArtNo.000-0009 Wok ring, cast
Griddle plate (Supplied) Teppanyaki (optional)
ArtNo.311-0043 - Griddle 09
Griddle plate (optional) Grill pan and trivet
4 Flat shelves with runners Handyrack (optional)
ArtNo.324-0003 Handyrack
Plinth Stability location bracket
ArtNo.350-0008 - 90 SC plinth
Restraining chain & hook * Stability bracket
ArtNo.020-0021 - Restraining
chain & hook
Conduit box Roasting tin (optional)
ArtNo.324-0004 Roasting tin
Loading ...
Loading ...
Loading ...