Loading ...
Loading ...
Loading ...
Before drilling any holes check that the area behind the surface to be drilled is clear of any
electrical cables, pipes etc. The ceiling must take a weight bearing of at least 40kgs weight.
Whenever possible protect the Rangehood with a fabric sheet or similar.
When installing the rangehood, the lower edge of the unit must be a minimum of 600mm (650mm for
gas cooker) above the cooking range. The recommended position for the hood is 650mm above the
hotplates.
Pictured: Minimum height from the hob surface to the underside face of the rangehood is:
600mm for electric hob, 650mm for gas hob
Notes: If the instructions for the gas hob specify a greater distance, this has to be taken into account.
Any installation above 750mm will compromise performance.
Installation
Loading ...
Loading ...
Loading ...