CHX9136SQB1 Kobe

User Manual - Page 14

For CHX9136SQB1.

PDF File Manual, 28 pages, Read Online | Download pdf file

CHX9136SQB1 photo
Loading ...
Loading ...
Loading ...
11
Wiring to Power Supply
CAUTION
: If moving the cooking range is
necessary to install the hood, turn off the power in
an electric range at the main electrical box. SHUT
OFF THE GAS BEFORE MOVING A GAS RANGE.
RISK OF ELECTRICAL SHOCK.
THIS RANGE HOOD MUST BE PROPERLY
GROUNDED. MAKE SURE THIS IS DONE BY
QUALIFIED ELECTRICIAN IN ACCORDANCE WITH
ALL APPLICABLE NATIONAL AND LOCAL
ELECTRICAL CODES. BEFORE CONNECTING
WIRES, SWITCH POWER OFF AT SERVICE PANEL
AND LOCK SERVICE PANEL TO PREVENT POWER
FROM BEING SWITCHED ON ACCIDENTALLY.
8. If hood is operating normally, connect three wires
(black, white and green) to house wires and cap
with wire connectors.
9. Store wires in the wiring box.
Ductwork Installation
10. Use steel pipe to connect the exhaust on the hood
to the ductwork. Use duct tape to make all joints
secure and air tight.
Duct Cover
Installation
11. Mark the position of the Duct Cover-Mounting
Bracket {N}. Use reference E from Table 2 and
measurements on page 16-17. Attach and secure
Duct Cover-Mounting Bracket {N} with two screws
(provided). Refer to Figure 17. NOTE: Inner duct
cover will cover the Duct Cover-Mounting Bracket.
12. Position the entire duct cover up onto the hood.
13. Secure the inner duct cover with two (3/16” x 3/8”)
screws {M} to the Duct Cover-Mounting Bracket {N}.
Shown in Figure 18.
14. Fasten outer duct cover to Duct Cover Support {O}
with four (4 x 6 mm) screws {M}.
Figure 17
Figure 18
Attach Together
Loading ...
Loading ...
Loading ...