Loading ...
Loading ...
Loading ...
Instal ion
Site Preparation
1 Position the unit on a flat, level surface
capable of supporting the entire weight of the
unit. Remember the unit will be significantly
heavier once it is fully loaded.
2 This unit requires a grounded and polarized
115 VAC, 60Hz, 15A circuit (normal
household current).
3 Avoid connecting the unit to a Ground
Fault Interruptor (GFI). GFIs are prone to
nuisance tripping which will cause the unit to
shut down. GFIs are generally not used on
circuits which power equipment that must run
unattended for long periods of time.
4 The unit must be installed according to your
local codes and ordinances.
5
Position the unit to allow free air flow through
the front grille.
Leve ing the Unit
Position the unit on a flat, level surface capable of
supporting the entire weight of the unit when full.
This unit contains four (4) adjustable leveling
legs. Turn the legs clockwise to raise and
counterclockwise to lower,
6
7
Wipe out inside of unit with a damp cloth.
Be sure to install the Anti-Tip bracket. Follow
the instructions provided with the Anti-Tip
bracket kit.
Loading ...
Loading ...
Loading ...