Loading ...
Loading ...
Loading ...
©2018 Hestan Commercial Corporation
25
5
7
6
nal position.
Once the previous steps are complete, move the unit into its
5
If the units are to be installed inside an enclosed structure,
it is necessary to design a ventilation shaft at the back of
the enclosure to assure proper ventilation at the back of the
the unit into its nal position inside the enclosure or structure.
Check the levelling of the appliance, adjusting its feet and
wheels to correct it if necessary.
6
7
unit. A 1/4 gap is sufcient to prevent overheating. Always
mount front panels on the door and drawer before moving
To make this operation easier keep the door and the drawer
previously installed side proles.
open.
Secure the appliance to the adjacent cabinets using the
Mount the included covers by rst inserting them laterally
then pushing rmly until a click” is heard.
(continued)
LOCATION AND INSTALLATION
MOVING THE UNIT INTO FINAL POSITION
EN
Loading ...
Loading ...
Loading ...