Falcon CDL90DFWH-CH 90cm Freestanding Dual Fuel Oven/Stove

User Manual - Page 31

For CDL90DFWH-CH.

PDF File Manual, 56 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
INSTALLATION
Check the appliance is electrically safe and gas sound when you have nished.
27
Roasting tin Handyrack
ArtNo.324-0004 Roasting tin
ArtNo.324-0003 Handyrack
Tall oven shelves and shelf
supports
2-piece plinth
ArtNo.000-0010 Tall oven shelves
Splashback Stability location bracket
Restraining chain & hook Conduit box
ArtNo.020-0021 - Restraining
chain & hook
Stability bracket
You will need the following equipment to complete the
cooker installation satisfactorily:
Stability bracket: If the cooker is to be supplied with gas
through a flexible hose, a stability bracket or chain must
be fitted. These are not supplied with the cooker but
are available at most builders’ merchants.
Gas pressure tester/manometer.
Flexible gas hose: Must be in accordance with the
relevant standards.
Multimeter: For electrical checks.
You will also need the following tools:
1. Electric drill
2. Masonry drill bit (only required if tting the cooker on a
stone or concrete oor)
3. Wall plugs (only required if tting the cooker on a stone
or concrete oor)
4. Steel tape measure
5. Cross head screwdriver
6. Flat head screwdriver
7. Spirit level
8. Pencil
9. Adjustable spanner
10. Screws for tting stability bracket
11. 4 mm & 3 mm Allen keys
12. 13 mm spanner or socket wrench
Checking the Parts:
3 pan supports Griddle plate (Supplied)
Teppanyaki (Optional) Wok cradle
ArtNo.311-0043 - Griddle 09
ArtNo.000-0009 Wok ring, cast
Grill pan and trivet 2 at shelves
Loading ...
Loading ...
Loading ...