Loading ...
Loading ...
Loading ...
![](https://files.manualsfile.com/84047835-79691382410/bg8.png)
KEY DIMENSIONS AND SPECIFICATIONS
Description Dryer (Gas and Electric)
Electrical Requirements Refer to the rating label
Gas Requirements* NG. 4-10.5 inches WC (Water Column)
Gas Requirements* LP. 8-13 inches WC
Dimensions 27 in. (W) X 30 1/4 in. (D) X 38 11/16 in. (H), 51 3//16in. (D with door open)
68.6 cm (W) X 76.7 cm (D) X 98.3 cm (H), 130 cm (D with door open)
Net Weight Electric : 133.6 lb. (60.6 kg) Gas : 137.6 lb. (62.4 kg)
Drying Capacity IEC 7.4 cu. ft.
*Gas Models Only
LOCATION REQUIREMENTS
Standard Installation - Side View
IMPORTANT: Read all installation instructions
completely before installing and operating your dryer.
It is important that you review this entire manual before 22 1/2in.
installing and using your dryer. It contains detailed (57.3cm)
instructions concerning electrical connections, gas
connections and exhaust requirements.
CHOOSE THE PROPER LOCATION
• Store and install the dryer where it will not be exposed
to temperatures below freezing or exposed to outdoor
weather conditions.
• Choose a location with a solid, level floor.
• If the dryer is being installed in a garage, place the
dryer at least 18 inches (45.7cm) above the floor.
• Properly ground the dryer to conform with all
governing codes and ordinances.
• To reduce the risk of electric shock, do not install the
dryer in clamp or wet locations.
NOTE: Installing the dryer in a humid space, or installing or
storing the dryer where it will be exposed to the weather or
freezing temperatures, may result in rust or other dam-
age that is not covered by the product warranty.
IMPORTANT: If you are installing your dryer in a
manufactured or mobile home, please refer to the
Special Electrical Requirements for Mobile or
Manufactured Homes section.
CLEARANCES
• Most installations require a minimum 5 inch (12.7 cm)
clearance behind the dryer for the exhaust ducting.
• Allow minimum clearances of at least 1 inch (2.5 cm)
on the sides and back to minimize vibration and noise.
• Allowing additional clearance for installation and
servicing is recommended.
• Be sure to allow for wall, door, or floor moldings that
may increase the required clearances.
• Allow at least 22 1/2 inches (57.3 cm) in front of the
dryer to open the door.
Standard Installation - Front View
00
1in. --,.-I!-- --I_ 1in.
(2.5 cm) 27 in. (2.5 cm)
(68.6 cm)
O
f
3"
(7.6 cm)
_ Vent
48 sq. in. --
(310 sq. cm.)
Vent
24 sq. in.
(155 sq. cm.)
/ 3" I_
(7.6 cm)
i
O
Additional instructions for closet installations:
The closet door must allow for sufflcient airflow. Refer to the
diagram above for minimum vent opening requirements. A
Iouvered door is also acceptable.
Loading ...
Loading ...
Loading ...