Loading ...
Loading ...
Loading ...
i!_!_i!i_ii_!i!_!_i!i_ii_!i!_!_i!i_ii_!i!_!_i!i_ii_!i!_!_i!i_ii_!i!_!_i!i_ii_!i!_!_i!i_ii_!i!_!_i!i_ii_!i!_!_i!i_ii_!i!_!_ii_i
stallation
Site Preparation
1 Position the appliance on a fiat, level surface
capable of supporting the entire weight of
the unit. Remember the appliance will be
significantly heavier once it is fully loaded.
2 This appliance requires a grounded and
polarized 115 VAC, 60Hz, 15A circuit (normal
household current).
3 Avoid connecting the unit to a Ground Fault
Interruptor (GFI). GFIs are prone to nuisance
tripping which will cause the unit to shut down.
GFIs are generally not used on circuits which
power equipment that must run unattended for
long periods of time.
4 The appliance must be installed according to
your local codes and ordinances.
Levelingthe Appliance
Position the appliance on a fiat, level surface capable
of supporting the entire weight when full.
This appliance contains four (4) adjustable
i!_!_i!i_ii_!i!_!_i!i_ii_!i!_!_i!i_ii_!i!_!_i!i_ii_!i!_!_i!i_ii_!i!_!_i!i_ii_!i!_!_i!i_ii_!i!_!_i!i_ii_!i!_!_i!i_ii_!i!_!_ii_i
Loading ...
Loading ...
Loading ...