Patriot Lighting 20777 Ceiling Fan

Owner’s Manual - Page 8

For 20777.

PDF File Manual, 11 pages, Read Online | Download pdf file

20777 photo
Loading ...
Loading ...
Loading ...
8
ASSEMBLY INSTRUCTIONS
14
15
16
14. Install the E26-base LED bulbs into the sockets of the
light kit.
Important: Make sure you allow the bulbs and light kit to
cool before you replace the bulbs.
15. Attach the glass bowl to the light kit by twisting the
glass bowl rmly in a clockwise direction until it is secure.
CAUTION: Avoid cross-threading the glass during
installation. Improper installation could cause the glass
bowl to be dicult to remove or fall, which could cause
serious injury.
16. Turn on the circuit breakers and the wall switch to the
fan supply lead lines.
Assembly is complete.
Light Kit
Bulb
Light Kit
Glass Bowl
13. Remove one of the three light pan screws from the
light pan and loosen the other two but do not remove.
Connect the 6-pin connector from the light pan to the
6-pin connector from the light kit. Lift the two keyhole
slots in the light kit over the two loosened light pan
screws and turn in a clockwise direction. Then, use the
previously removed light pan screw to secure the light kit
to the light pan. Tighten all screws.
6-pin
Connector
Light Kit
Light Pan Screw
Light
Pan
13
Loading ...
Loading ...
Loading ...