Loading ...
Loading ...
Loading ...
Installation
52
The nozzles not provided are available at Authorised Service Centres.
7 LPG G30/31 AUX SR R UR-3c
Rated heating capacity (kW) 1.0 1.75 2.9 4.0
Nozzle diameter (1/100 mm) 50 65 85 102
Pre-chamber (printed on nozzle) ----
Reduced flow rate (W) 400 500 800 1600
Rated flow rate G30 (g/h) 73 127 211 291
Rated flow rate G31 (g/h) 71 125 207 286
8 LPG G30/31 AUX SR R UR-3c
Rated heating capacity (kW) 1.0 1.8 2.9 4.0
Nozzle diameter (1/100 mm) 50 65 81 94
Pre-chamber (printed on nozzle) ----
Reduced flow rate (W) 450 550 800 1600
Rated flow rate G30 (g/h) 73 131 211 291
Rated flow rate G31 (g/h) 71 129 207 286
9 LPG G30/31 AUX SR R UR-3c
Rated heating capacity (kW) 1.0 1.8 2.9 3.8
Nozzle diameter (1/100 mm) 43 58 74 77
Pre-chamber (printed on nozzle) (H2) (M) (Z) (F4)
Reduced flow rate (W) 400 500 800 1600
Rated flow rate G30 (g/h) 73 131 211 291
Rated flow rate G31 (g/h) 71 129 207 286
10 Town gas G110 AUX SR R UR-3c
Rated heating capacity (kW) 1.0 1.8 2.8 3.8
Nozzle diameter (1/100 mm) 145 185 260 340
Pre-chamber (printed on nozzle) (/8) (/2) (/3) (/13)
Reduced flow rate (W) 400 500 800 1400
WARNING: In the case of conversion to Town Gas G110 – 8 mbar (category
1a), do not use the burners provided, but request the special G110 burners kit
from our Technical Assistance Service.
Loading ...
Loading ...
Loading ...