INSTALLATION
WALL DRILLING AND BRACKET FIXING
As the rst step, proceed with the following drawings:
A vertical line up to the ceiling or up to the upper limit, at the center of the area in which the
hood is to be tted.
A horizontal line A at 1320 – 1700 mm above the cooker top.
A horizontal line B at minimum 926 mm above the cooker top.
A horizontal line C at minimum 730 (910 optional) mm above the cooker top.
Mark points:
Mark a point (1) on the horizontal line A, 60 mm to the vertical reference line.
Repeat this operation on the other side, checking that the two marks are on one horizontal line.
Mark a point (2) on the horizontal line B, 80 mm to the vertical reference line.
Repeat this operation on the other side and on the vertical reference line, checking that the
three marks are on one horizontal line.