Zephyr AK8000CS

User Manual - Page 13

For AK8000CS.

PDF File Manual, 48 pages, Read Online | Download pdf file

AK8000CS photo
Loading ...
Loading ...
Loading ...
13
Twister & Tornado I Use, Care, and Installation Guide
ZEPHYRONLINE.COM
Installation Instructions
Mounting the Hood
At least two installers are required due to the weight
and size of the hood.
CAUTION
1. Install optional AK08xxAS Stainless Steel Liner.
Review manual included with liner for more details.
2. If no liner is used, cut out an opening in bottom of
the cabinet by following the dimensions in FIG. B.
3. Remove (6) screws from the inner brackets on the
face plate in FIG. C. Disconnect the wiring and
remove the face plate.
4. If ducting vertically, continue to step 5. If ducting
horizontally, knock out the rear duct 6” hole before
installing the hood.
5. Lift power pack into opening and ensure locking
clip has locked into position. Locking clip is located
on left side of power pack. FIG. D.
6. Fasten (2) M4 screws into each long side of power
pack. If a liner is used, the screws will go through
the power pack mounting holes, then the liner and
into the wood base.
NOTE: Wood blocking may need to be added to
cabinet base if additional support is needed.
Refer to FIG. E.
7. If ducting horizontally, continue instructions on
page 14.
8. Install duct work and seal with duct tape. Install
electrical and reconnect all the wiring.
9. Remove all packing materials before using power
pack. Switch power on and check for leaks around
duct tape.
10. Install face plate and filters.
FIG. B
cabinet bottom cut-out size
26-
7/8
10-
5/8
FIG. D
wood base
metal or other non
combustible material
FIG C
locking clip
mounting holes
FIG. E
wood base
2” minimum
secure (2) M4 screws to mounting
holes on each long side of Power Pack
Right Side View
Ductwork
FIG. C
Loading ...
Loading ...
Loading ...