Loading ...
Loading ...
Loading ...
12
EN
PRODUCT OVERVIEW
A Lid Cover
B Filer
C Body
D Base
E Power Indicator Light
F On/Off Switch
G Handle
H Thermometer
INITIAL COMMISSIONING
Boil 2x clear water before the rst use:
1. Fill the jug.
2. Place the jug on the base station.
3. Set the power connection
4. Switch on the device. This will switch on the operation led.
5. The boiler switches off automatically after use.
Note: Do not open the lid during pouring. Do not overll the boiler with water. In this
case the water will boil over.
Loading ...
Loading ...
Loading ...