Loading ...
Loading ...
Loading ...
Page 14
2. PREPARE AIR CONDITIONER
Before installing the unit, the top rail must be assembled on the unit for models with a
capacity of less than 10,000Btu/h.
1. PREPARE THE WINDOW
Lower sash must open sufficiently to allow a clear vertical opening (see dimension
H in Table 1). Side louvers and the rear of the AC must have clear air space to allow
enough airflow through the condenser for heat removal. The rear of the unit must be
outdoors, not inside a building or garage.
NOTE
Save carton and these Installation Instructions for future reference. The carton is the
best way to store unit during winter, or when not in use.
A: Remove the air conditioner from
the carton and place on a flat
surface.
B: Remove top rail from the
packaging material as shown in
Fig. E.
Installation
Instructions
Packaging
Top Rail
Fig. E
CAUTION
When handling unit, be careful
to avoid cuts from sharp metal
edges and aluminum fins on front
and rear coils.
Mounting Hardware
3/4’ (or 1/2”) Screws
(7)
Lock Frame
(For Wooden windows)
(2)
Sash Lock
(1)
Lock Frame
(For Vinyl-Clad windows)
(2)
Window sash
seal foam
(1)
3/8” Screws
(4)
Top Rail
(1)
Top Rail Hardware
Loading ...
Loading ...
Loading ...