Loading ...
Loading ...
Loading ...
4
INSTALLATION REQUIREMENTS
TOOLS AND PARTS
Gather the required tools and parts before starting installation.
Tools needed for all installations:
Level
Tape measure Pliers
Flat-blade screwdriver #2 Phillips screwdriver
Adjustable wrench that
opens to 1" (25 mm) or
hex-head socket wrench
Tin snips (new vent
installations)
Caulking gun and
compound (new vent
installations)
¼" and
5
/
16
" nut driver
(recommended)
Leveling legs (4)
Tools needed for gas installations:
8" or 10" pipe wrench
8" or 10" adjustable wrench
(for gas connections)
Pipe-joint compound
resistant to LP gas
Utility knife
“Y” connector
Parts package is located in dryer drum. Check that all parts
are included.
NOTE: Do not use leveling legs supplied with dryer if installing
with a pedestal or a stack kit.
Parts supplied (all models):
Parts supplied (steam models):
2' (0.6 m) inlet hose
Parts needed: (Not supplied with dryer)
Vent clamps
Vent elbows and vent work
Rubber washer
Loading ...
Loading ...
Loading ...