Loading ...
Loading ...
Loading ...
PREPARE AIR CONDITIONER
Remove the backing from the top
mounting rail seal strip and attach it
to the bottom of the top mounting rail.
Cut to size.
Install the top mounting rail with 3 or 4
type A screws (depending on the number
of holes in the top mounting rail) from the
outside of the case.
3
A
B
Top mounting
rail
Bottom
mounting rail
Installation Instructions
STORM WINDOW REQUIREMENTS
A storm window frame will not allow the air
conditioner to tilt toward the outside, and will
keep it from draining properly. To adjust for
this, attach a piece of wood to the sill.
WOOD PIECES –
WIDTH: 2
LENGTH: Long enough to fit inside the
window frame.
THICKNESS: To determine the thickness,
place a piece of wood on the sill to make
it 1/2 higher than the top of the storm
window frame or the vinyl frame.
Attach securely with nails or screws
provided by the installer.
2
11
1/2higher
than storm
window
frame
Storm window
frame
Wood
Sill
1/2higher
than vinyl frame
(on some windows)
Vinyl frame
WINDOW REQUIREMENTS
These instructions are for a standard
double-hung window. You will need to modify
them for other types of windows.
All supporting parts must be secured to firm
wood, masonry or metal.
The electrical outlet must be within reach
of the power cord.
Follow the dimensions in the table and
illustration for your model.
Models A B
ASQ05, ASS05, ASV05 11 3/4 min. 22–36
ASQ06, ASV06 13min. 22–36
ASM05, ASM06 13 1/2min. 22–36
ASQ08, ASV08 13 1/2min. 24 1/2–36
1
A
(With accordion panels)
B
Loading ...
Loading ...
Loading ...